How long before you can inject a foundation crack?
About 2 to 3 hours after you paste the ports on, with the Concrete Sealers USA kit. That gives the epoxy paste time to set so it can hold the injection pressure. Mixed paste only stays workable for 6 to 7 minutes, so mix small batches. For the foam cure time, follow the kit instructions.
What happens in those 2 to 3 hours?
The epoxy paste goes from soft to hard. The maker of the kit in our review says it allows injection within 2 to 3 hours. Inject too early and the foam pressure can push a port off or force its way out along the crack face.
How should you plan the day?
This follows the order in our step-by-step repair guide.
| Step | Time |
|---|---|
| Clean and dry the crack | 30 to 60 minutes |
| Mix and apply paste, set ports | Work in batches of 6 to 7 minutes |
| Wait for the paste to set | 2 to 3 hours |
| Inject foam, bottom port up | Depends on crack length |
The cleaning and injecting times are rough guides, not manufacturer figures. Your crack length and how dirty the wall is will change them.
How long until the foam is done?
The kit page does not list a cure time for the foam, so follow the printed kit instructions. Leave the ports alone until the instructions say you can cut them off, and wait for the next heavy rain before you call the job done.
Full guide: How to Fix a Leaking Foundation Crack Yourself, Step by Step